18 Years Factory Solar Panel Installation Rig - HDD Drill Rod & Pipe for Directional Drilling For Vermeer DitchWitch – TDS
18 Years Factory Solar Panel Installation Rig - HDD Drill Rod & Pipe for Directional Drilling For Vermeer DitchWitch – TDS Detail:
The raw materials selected by our company are all the alloy structure steels for geographical usage produced by Baogang Steel. After laboratory tests, both ends of a pipe are upsetted and proceeded to overall heat treatment, then friction welded. Before finished drill pipes are plated and packaged, a series of tests have to be implemented including hardness, metallurgical structure, physical performances, etc.
Compatible with Vermeer HDD Rigs
Rig Compatibility* | Thread | Length | Pipe OD | Joint OD | Pin Length (mm) | Max. Torque (Nm) | |||
mm | ft | mm | inch | mm | inch | ||||
D7x11, D10x15 | #200 | 1,829 | 6 | 42 | 1.66 | 48 | 1.88 | 50.7 | 2,040 |
D20x22, D23x30 | #400 | 3,048 | 10 | 52 | 2.06 | 57 | 2.25 | 63.5 | 3,525 |
D24x40 | #600 | 3,048 | 10 | 60 | 2.38 | 67 | 2.63 | 63.5 | 5,695 |
D33x44, D36x50 | #650 | 3,048 | 10 | 60 | 2.38 | 70 | 2.75 | 63.5 | 6,800 |
D33x44, D36x50 | #650 | 4,572 | 15 | 60 | 2.38 | 70 | 2.75 | 63.5 | 6,800 |
D36x50, D40x55 | #700 | 3,048 | 10 | 67 | 2.63 | 79 | 3.1 | 76.2 | 7,457 |
D36x50, D40x55 | #700 | 4,572 | 15 | 67 | 2.63 | 79 | 3.1 | 76.2 | 7,457 |
D50x100, D60x90 | #900 | 3,048 | 10 | 73 | 2.88 | 83 | 3.25 | 88.9 | 12,202 |
D50x100, D60x90 | #900 | 4,572 | 15 | 73 | 2.88 | 83 | 3.25 | 88.9 | 12,202 |
Compatible with Ditch Witch HDD Rigs
Rig Compatibility* | Thread | Length | Pipe OD | Joint OD | Pin Length (mm) | Max. Torque (Nm) | |||
mm | ft | mm | inch | mm | inch | ||||
JT2720 | 1.94 | 3000 | 9.84 | 60 | 2.38 | 70 | 2.75 | 75 | 4340 |
JT20 | 1.94 | 3000 | 9.84 | 52 | 2.06 | 67 | 2.63 | 75 | 2980 |
JT2720M1, JT3020M1 | 2.11 | 3000 | 9.84 | 60 | 2.38 | 76.2 | 3 | 84.7 | 5420 |
JT25/30 | 2.11 | 3000 | 9.84 | 60 | 2.38 | 70 | 2.75 | 84.7 | 5420 |
JT4020 | 2.4 | 4500 | 14.76 | 73 | 2.88 | 82 | 3.23 | 99.5 | 6800 |
JT4020M1 | 2.59 | 4500 | 14.76 | 76 | 3 | 89 | 3.5 | 91.5 | 6800 |
JT7020M1, JT8020M1, JT100M1 | 3.27 | 4500 | 14.76 | 89 | 3.5 | 102 | 4 | 132.5 | 13,560 |
Product detail pictures:
Related Product Guide:
We can easily usually fulfill our respected customers with our very good top quality, very good price tag and excellent support due to we have been more expert and much more hard-working and do it in cost-effective way for 18 Years Factory Solar Panel Installation Rig - HDD Drill Rod & Pipe for Directional Drilling For Vermeer DitchWitch – TDS , The product will supply to all over the world, such as: Iran, Cyprus, Pakistan, Our company abides by the management idea of "keep innovation, pursue excellence". On the basis of assuring the advantages of existing merchandise, we continuously strengthen and extend product development. Our company insists on innovation to promote the sustainable development of enterprise, and make us become the domestic high-quality suppliers.
By Amber from Iran - 2018.06.05 13:10
This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
By Julia from US - 2017.11.12 12:31
Write your message here and send it to us